DCVG SURVEY SERVICE

BTC CRUDE OIL PIPELINE

In today’s world, as the demand for energy and oil continually escalates, the sustainability and efficient operation of existing production and transmission systems are increasingly critical. Cathodic protection systems and their regular testing are among the most crucial practices for maintaining the dynamism of these systems. For the Baku-Tbilisi-Ceyhan Crude Oil Pipeline, an essential conduit for oil transportation in our country managed by BOTAŞ International, necessary cathodic protection measurements are regularly conducted. As Enermak Enerji, we have successfully completed our DCVG Survey for the cathodic protection measurement applications planned for this year on the Baku-Tbilisi-Ceyhan Crude Oil Pipeline.

ENEMAK COMPLETED DCVG SURVEY SERVICES ON BTC CRUDE OIL PIPELINE

Enermak Enerji 2000-2004