Our infrastructure detection and mapping study carried out at EnerjiSA Üretim Tufanbeyli Thermal Power Plant.

Our infrastructure detection and mapping project at Enerjisa Üretim’s Tufanbeyli Thermal Power Plant has been successfully completed. The work involved identifying underground utility lines and generating detailed infrastructure maps.

WE HAVE SUCCESSFULLY COMPLETED THE INSTALLATION AND COMMISSIONING OF THE SEWERIN BIOCONTROL 4 BIOGAS ANALYZER AT THE ANKARA ASKİ TATLAR WASTEWATER TREATMENT PLANT.

TATLAR ATIKSU ARITMA TESİSİ ANKARA ASKİ TATLAR ATIKSU ARITMA TESİSİNDE SEWERIN BIOCONTROL 4 BİYOGAZ ANALİZÖRÜ KURULUMU VE DEVREYE ALINMASINI BAŞARIYLA…

End of content

End of content