We’re proud to announce the successful installation and commissioning of the Intereng P12i underground cable fault detection system—powered by cutting-edge German technology—for İSBAK, Istanbul’s Smart City Technologies authority. After rigorous testing and validation with İSBAK’s technical team, we conducted field trials on a critical main road in Istanbul. Despite the complexity of the location, our team pinpointed the fault at the 3,210th meter of a 6,400-meter MV line with precision and delivered the project seamlessly. This achievement strengthens İSBAK’s ability to manage urban infrastructure and respond swiftly to faults, contributing to a safer and smarter Istanbul.


